HP StorageWorks Storage Mirroring Reporting Center user's guide (T2558-96324, April 2009)

5 - 5
f. On the Advanced tab, enter a Name and Description for the schedule.
g. Click the Add button. The Schedule Component Properties dialog box will appear.
1. Select whether the rule is to Include or Exclude the criteria.
2. Select the Type of schedule. The bottom half of the screen will display different
configuration criteria based on the schedule type.
Type Criteria Description
Dates Date Click on the Date button to view a calendar dialog box. In
the Calendar dialog box, select a specific date, time, and
time zone.
Hours At Enter the minute and second for the time to run the report.
Time Zone Enter the time zone for the selected time.
Filter Select Hour Filter to select hours at which the report will
be run.