Managing Serviceguard Fifteenth Edition, reprinted May 2008

545
package and cluster maintenance
, 329
package configuration
distributing the configuration file
, 320, 388
multi-node packages, 327
planning, 169
run and halt script timeout parameters, 310
service name parameter, 309
step by step, 275
subnet parameter, 309
system multi-node packages, 325
using Serviceguard commands, 377
verifying the configuration, 320, 388
writing the package control script, 383
package configuration file
package dependency paramters
, 293
successor_halt_timeout, 291
package coordinator
defined
, 65
package dependency
parameters
, 293
successor_halt_timeou, 291
package failover behavior, 175
package failures
responses
, 129
package IP address
defined
, 99
package IP addresses, 100
defined, 99
reviewing, 422
package manager
blank planning worksheet, 507
testing, 406
package switching behavior
changing
, 358
Package types, 26
failover, 26
multi-node, 26
system multi-node, 26
package types, 26
packages
deciding where and when to run
, 75, 76
managed by cmcld, 60
parameters
for failover
, 175
parameters for cluster manager
initial configuration
, 65
PATH, 309
persistent LUN binding
defined, 112
physical volume
for cluster lock
, 69
parameter in cluster lock configuration, 159
physical volumes
creating for clusters, 217
filled in planning worksheet, 503
planning, 149
worksheet, 150, 154
planning
cluster configuration, 155
cluster lock and cluster expansion, 146
cluster manager configuration, 156
disk groups and disks, 152
disk I/O information, 139
for expansion, 174
hardware configuration, 134
high availability objectives, 132
LAN information, 136
overview, 131
package configuration, 169
power, 142
quorum server, 146
SCSI addresses, 138
SPU information, 135
volume groups and physical volumes, 149
worksheets, 141
worksheets for physical volume planning,
503
planning and documenting an HA cluster,
131
planning for cluster expansion, 132
planning worksheets
blanks, 499
point of failure
in networking, 40
point to point connections to storage devices,
55
ports
dual and single aggregated
, 109
power planning
power sources
, 142
worksheet, 144
power supplies
blank planning worksheet
, 500
power supply
and cluster lock
, 53
blank planning worksheet, 501
UPS for OPS on HP-UX, 53
Predictive monitoring, 410
primary LAN interfaces
defined
, 38