Managing Serviceguard 12th Edition, March 2006

Cluster and Package Maintenance
Reconfiguring a Package
Chapter 7 355
Change halt
script contents
It is recommended that the package be halted. If
the halt script for the package is modified while
the package is running, timing may cause
problems.
Script timeouts Package may be either running or halted.
Service timeouts Package must not be running.
Service failfast Package must not be running.
Package
AutoRun
Package may be either running or halted.
Local LAN
Failover
Package may be either running or halted.
Change the order
of nodes where a
package may run
Package may be either running or halted.
Change the
Package Failover
Policy
Package may be either running or halted.
Change the
Package
Failback Policy
Package may be either running or halted.
Change access
policy
Package may be either running or halted.
Add or delete a
configured
dependency
Both packages may be either running or halted
with one exception:
If a running package adds a dependency, the
dependency package must already be running on
the same node(s).
Table 7-2 Types of Changes to Packages (Continued)
Change to the
Package Required Package State