Using Serviceguard Extension for RAC, 4th Edition, February 2007

Software Upgrades
Rolling Software Upgrades
Appendix A220
Step 1.
1. Halt Oracle (RAC, CRS, Clusterware, OPS) software on node 1.
2. Halt node 1. This will cause the node’s packages to start up on an
adoptive node. You can do this in Serviceguard Manager, or from the
command line issue the following:
# cmhaltnode -f node1
This will cause the failover package to be halted cleanly and moved to
node 2. The Serviceguard daemon on node 1 is halted, and the result is
shown in Figure A-2.
Figure A-2 Running Cluster with Packages Moved to Node 2