Using Serviceguard Extension for RAC, 10th Edition, April 2013
Figure 22 Running Cluster Before Rolling Upgrade
1. Halt Oracle (RAC, Clusterware) software on node 1.
2. Halt node 1. This will cause the node’s packages to start up on an adoptive node. You can
do this in Serviceguard Manager, or from the command line issue the following:
# cmhaltnode -f node1
This will cause the failover package to be halted cleanly and moved to node 2. The Serviceguard
daemon on node 1 is halted, and the result is shown in Figure 23.
Figure 23 Running Cluster with Packages Moved to Node 2
Upgrade node 1 and install the new version of Serviceguard and SGeRAC (A.11.16), as shown
in Figure 24.
NOTE: If you install Serviceguard and SGeRAC separately, Serviceguard must be installed before
installing SGeRAC.
146 Software Upgrades