HP StorageWorks Reference Information Storage System V1.5 Administrator Guide (T3559-96044, June 2006)

2. Log on to the database system.
3. If the database server was reinstalled, run one of the following commands to restore the
/db2/VolBack partition from either the version stored on the kickstart server or tape backups.
NOTE:
This w ill delete the content of the VolBack directory.
/opt/bin/backup/db2BackupUtility -restore_from_kickstart
/opt/bin/backup/db2BackupUtility -restore_from_tape
4. Torestorethedatabase,makesurethedatabaseisupbyissuingthecommand:
su db2udb –c db2start
5. To restore D B2, run the following command. It will ask for a timestamp of a backup to restore.
Normally, the last two backups of the database are kept.
/opt/bin/backup/db2BackupUtility -restore_db2
6. After the installation is finished, run /opt/bin/start on the PCC server to start the RISS system
and validate that it operates correctly.
Restoring the master configuration files
Copies of the master configuration files are kept in the /usr/local/MasterConfigFiles
directory on the PCC server. Whenever one of the files is changed on the kickstart server and
the converter is run, the master configuration file is copied to the PCC server, and renamed to
YYYY-MM-DD-hh.mm.ss_FileName. It is also backed up to tape, if application backup is enabled.
To restore this directory from the tape backup, run the following command on the PCC server:
/usr/local/tsmBackup/rotateMasterConfigBackup –restore
Reference Information Storage System Version 1.5
71