HP StorageWorks XP24000/XP20000 Disk Array Site Preparation Guide (AE002-96055, September 2010)
ReferenceNoYesChecklist questions*
Sources of electrical interference, page 43
Have all sources of electrical interferences been
corrected?
*
NA
Does the customer site have access control (for
example, will HP representatives need an es-
cort)?
NA
Does the computer room have access control
(for example, will HP representatives need a
security code)?
Delivery space requirements, page 21
Are all floors, stairs, elevators, stairwalkers, lifts,
ramps, or ladders needed to move the equip-
ment adequate to support its weight and size?
*
Delivery space requirements, page 21
Will the equipment fit through all doors and
corridors and in lifts?
*
NA
Does the building have a loading dock? Maxim-
um access height is _____m.
*
NA
For any additional equipment required (for ex-
ample, connectors, receptacles, cables, and any
equipment not supplied by HP), is the equipment
on site and ready for use?
Site preparation time allowances
The following tasks may require several weeks:
• Acquiring required power connectors
• Arranging for an electrician
• Adding or modifying air conditioning systems
• Making building alterations
• Placing an order for data communication equipment, including equipment required to support the
Internet-based remote support option.
The time between placing an equipment order and actual delivery can vary. Contact your HP
representative to determine the best estimated delivery dates.
Site preparation team and tasks12