HP StorageWorks XP24000/XP20000 Audit Log Reference Guide (AE131-96085, May 2011)

Table 160 Uninstall Operation (Uninstalling a Cache Memory Module)
DescriptionItem
The mounting location of the PCB for cache memory.CM
The capacity of CMG.CMG
The capacity of cache memory.Size
The capacity of On-Demand.On-Demand
The number of cache memory.Num. of CMs
The capacity of Cache Residency.DCR available size
The CLPR number.CLPR
The capacity of the cache memory allocated to CLPR.Cache size
The capacity of Cache Residency allocated to CLPR.DCR size
The number of extents allocated to CLPR.Extent Number
The number of CLPR.Num. of CLPRs
The mounting location of the shared memory.SM
The slot position of the shared memory module.Slot
The capacity of the shared memory module.Size
The number of shared memory modules.Num. of SMMs
The mounting location of the battery.Battery
Indicates the installation or the uninstallation of the battery.
Install: Install battery, Uninstall: Uninstall battery.
Define
The number of batteries.Num. of Batteries
NOTE: Only the changed items will be output.
Example 4 (uninstalling a shared memory module)
user-name,xx,YYYY/MM/DD,HH:MM:SS.xxx, 00:00,[Install],Uninstall,,Normal end,,,Seq.=xxxxx
+{SM,Slot,Size}=[{1SA/2SB,3,0},{1SA/2SB,4,0},{1SC/2SD,9,0},{1SC/2SD,10,0}],
Num. of SMMs=4
+PP Flag=[<16KLDEV/TC/UR/SI/VM>],Num. of PP Flags=1
+Max Number of CUs=4
+{Battery,Define}=[{BATTERY-13,Uninstall},{BATTERY-23,Uninstall}],
Num. of Batteries=2
[Install]
Install function
Uninstall
Uninstall operation
Normal end
The operation has ended normally.
Seq.=xxxxxx
Sequence number of log information (0000000000 to 4294967295)
Detailed Information
Detailed information displays for this operation, as shown in Table 161 (page 146).
Uninstall Operation 145