HP StorageWorks Audit Log reference guide (5697-5923, June 2006)

Audit Log Reference Guide 265
RCU
Operations
Add RCU RCU Add RCU
Change RCU Option Change RCU Option
Delete RCU Delete RCU
Add Path
Add Path (Note 1) (Note 2)
Delete Path
Delete Path (Note 1) (Note 2)
Add SSID Add RCU
Delete SSID Delete RCU
Port Change (Target, Initiator, RCU
Tar get)
PORT Change Port
Asynchronous Add CT Group TC z/OS (R) Add CTG
Operations CT Group Option Change CTG Option
Delete CT Group Delete CTG
Async Option Change Async Option
Script
Operations
Run Script Operation
Stop
Other
Operations
Clear SIM Clear SIM
Option Change Option
Universal
Replicator -
z/OS (R)
JNL Operation Edit JNL Volumes UR z/OS (R)
Journal-Vol (Note 1)
Change JNL Option
Journal-Option (Note 1)
Delete JNL Groups
Journal-Vol (Note 1)
Suspend Pair
Suspend-Pair (Note 1)
Resume Pair
Resume-Pair (Note 1)
Delete Pair
Delete-Pair (Note 1)
DKC Operation Add DKC RCU Add RCU
Change DKC Option Change RCU Option