HP ProLiant SL250s Gen8 Server User Guide

Hardware options installation 67
Tesla K20/K20X GPUs
11. Install the GPU cage.
12. Install the interposer board (on page 19).
13. Install the front GPU cage (on page 17).
14. Install the server into the chassis ("Installing the server into the chassis" on page 31).
15. Connect all peripheral cables to the server.
16. Power up the server (on page 15).
Connecting the SUV cable
CAUTION:
Before disconnecting the SUV cable from the connector, always squeeze the release
buttons on the sides of the connector. Failure to do so can result in damage to the equipment.
Item Connector Description
1
SUV port SUV port on the server front panel
2
SUV connector For connecting to the SUV connector on the