HP ProLiant SL250s Gen8 Server User Guide
Hardware options installation 55
14.
Install the FBWC capacitor pack into the holder mounted in the server tray.
15. Install the front GPU bracket (on page 20).
16. Install the interposer board (on page 19).
17. Install the front GPU cage (on page 17).
18. Install the SFF hot-plug drive cage ("Installing the SFF hot-plug drive cage" on page 23).
19. Install the server into the chassis ("Installing the server into the chassis" on page 31).
20. Connect all peripheral cables to the server.
21. Power up the server (on page 15).
Smart Array enablement Mini-SAS cable option
1. Power down the server (on page 15).
2. Disconnect all peripheral cables from the server.
3. Remove the server from the chassis (on page 15).
4. Remove the SFF hot-plug drive cage ("Removing the SFF hot-plug drive cage" on page 22).
5. Remove the front GPU cage (on page 16).
6. Remove the interposer board (on page 18).
7. Remove the front GPU bracket (on page 19).
8. Remove the PCI riser cage (on page 23).
9. Install the storage controller ("Installing an expansion board" on page 57).