HP ProLiant SL250s Gen8 Server User Guide

Operations 22
IMPORTANT: If the DIMM latches are not fully closed, the baffle will not sit properly.
2. Install the front GPU bracket (on page 20).
3. Install the interposer board (on page 19).
4. Install the front GPU cage (on page 17).
5. Install the server into the chassis ("Installing the server into the chassis" on page 31).
6. Connect all peripheral cables to the server.
7. Power up the server (on page 15).
Removing the SFF hot-plug drive cage
1. Power down the server (on page 15).
2. Disconnect all peripheral cables from the server.
3. Remove the server from the chassis (on page 15).
4. Disconnect the drive cables from the drive backplane.
5. Remove the SFF hot-plug drive cage.