ProLiant ML570 Generation 3 Server User Guide
Hardware options installation 71
ROM-based diagnostics
1. Power up the server (on page 27).
2. Press the F10 key, when prompted, to enter the System Maintenance menu.
3. Select Diagnostics.
4. Run the Memory Diagnostics.
5. After the memory has been tested, exit the utility and reboot.
6. Select the AMP mode ("Selecting the AMP mode" on page 71).
Selecting the AMP mode
1. Upon reboot, press the F9 key, when prompted, to enter RBSU.
2. Select System Options.
3. Select Advanced Memory Protection.
4. Select the desired memory mode.
• Advanced ECC (hot-add enabled)
• Advanced ECC (hot-add disabled)
• Online Spare Memory with Advanced ECC
• Hot-Plug Mirrored Memory with Advanced ECC
• Hot-Plug RAID Memory with Advanced ECC
5. Press the Escape key twice to go back to the main RBSU menu.
6. Press the F10 key, when prompted, to exit RBSU. The server reboots and tests all memory in the
system.
IMPORTANT: To reconfigure the memory mode after initial setup, you must reboot the system, enter RBSU,
and select an AMP mode.
Tower-to-rack conversion
The tower-to-rack conversion kit includes all equipment required to convert the tower model server into a
rack model server, and to install the server into most square- or round-hole racks.
The tower-to-rack conversion kit includes:
• Rack rail assemblies
• Server rails
• Cable management arm bracket
• Cable management arm support bracket (screw retaining plate)
• Installation screws
• Cable management arm
• Rack bezel assembly
• Tower-to-rack conversion installation instructions document
In addition to the items supplied in the conversion kit, the following items are also needed:
• Torx T-15 screwdriver (clipped to the rear panel of the server)
Before proceeding with the tower-to-rack conversion:
1. Power down the server (on page 27).
2. Remove all power supply cables from the server.










