HP ProLiant ML570 Generation 2 Server Setup and Installation Guide
System Battery
HP ProLiant ML570 Generation 2 Server Setup and Installation Guide F-3
HP CONFIDENTIAL
Writer: Wendy Wing File Name: o-appf System Battery.doc
Codename: Time Bandit Part Number: 223960-002 Last Saved On: 8/22/02 11:25 AM
5. Insert the new battery.
Figure F-3: Installing the battery
6. Install the access panel as directed in Chapter 3, “Installing Hardware Options.”
7. Reconnect the power cord and peripheral devices. Refer to “Connecting the
Power Cord and Peripheral Devices” in Chapter 5, “Installing the Rack Server,”
or in Chapter 6, “Installing the Tower Server.”
8. Power up the server. Refer to “Powering Up the Server” in Chapter 5, “Installing
the Rack Server,” or in Chapter 6, “Installing the Tower Server.”
9. Run the RBSU to reconfigure the system with the new battery. Reset the time
and date. Refer to Chapter 8, “Server Configuration and Utilities.”










