Compaq ProLiant ML530 Setup and Installation Guide
Server Installation 3-35
Compaq Confidential – Need to Know Required
Writer: Tricia Acevedo Project: Compaq ProLiant ML530 Setup and Installation Guide Comments:
Part Number: 139006-002 File Name: d-ch3 Installation.doc Last Saved On: 6/15/00 9:02 AM
2. Verify that the front panel system status LED indicator, located nearest
the Power On/Standby switch, is off and that all fans stop spinning.
3. Disconnect all power cords from the server to disable all power to the
server.
Optional Installation Service
The installation service covers the entire hardware installation, from
unpacking the components to routing the cables and running a test of the
system. In the United States, Compaq will make all of the arrangements to
have the rack system installed by qualified Guaranteed Service Providers. An
order form with pricing is available from PaqFax, the Compaq fax retrieval
service. Call 1-800-345-1518, select PaqFax, and request Document 4552.
Installation can also be ordered from and provided directly by Compaq
authorized service providers.










