ProLiant ML530 Generation 2 Server Setup and Installation Guide

HP ProLiant ML530 Generation 2 Server Setup and Installation Guide 5-1
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: f-ch5 Installing the Rack Server.doc
Codename: Seattle Slew Part Number: 225579-002 Last Saved On: 1/8/03 3:17 PM
5
Installing the Rack Server
This chapter provides the required procedures for mounting an HP ProLiant ML530
Generation 2 server into a Compaq branded or industry-standard 19-inch rack. For
more information, see Chapter 2, “Planning the Server Installation.” Server cabling
and configuration are discussed in Chapter 7, “Cabling the Server” and Chapter 8,
“Server Configuration and Utilities.”
This chapter specifically addresses:
Server installation overview
Preparing the rack for server installation
Measuring with the rack template
Inserting cage nuts into the rack frame
Installing the rack rail assemblies
Preparing the server for rack installation
Attaching the server rails
Removing the power supplies
Attaching the cable management arm bracket