HP ProLiant ML370 Generation 3 Setup and Installation Guide

System Battery
HP ProLiant ML370 Generation 3 Server Setup and Installation Guide G-3
HP CONFIDENTIAL
Writer: Jennifer Hayward File Name: o-appg System Battery.doc
Codename: Dizzy Devil Part Number: 281992-002 Last Saved On: 12/3/02 2:53 PM
5. Install the new battery.
Figure G-3: Installing the battery
6. Install the access panel. Refer to Chapter 3, “Installing Hardware Options.”
7. Reconnect the power cord and peripheral devices. Refer to “Connecting the
Power Cord and Peripheral Devices” in Chapter 4 or in Chapter 5, “Installing the
Tower Server.”
8. Power up the server. Refer to “Powering Up the Server” in Chapter 4 or in
Chapter 5, “Installing the Tower Server.”
9. Run the System Configuration Utility to reconfigure the system with the new
battery. Refer to Chapter 7, “Server Configuration and Utilities.”