Compaq ProLiant ML350 Tower-to-Rack Conversion Guide
A-2 Compaq ProLiant ML350 Tower-to-Rack Conversion Guide
Compaq Confidential – Need to Know Required
Writer: Doug Warren Project: Compaq ProLiant ML350 Tower-to-Rack Conversion Guide Comments:
Part Number: 201346-001 File Name: d-appa Electrostatic.doc Last Saved On: 6/27/00 9:36 AM
■
Cover workstations with approved static-dissipating material. Use a
wrist strap, connected to the work surface, and properly grounded tools
and equipment.
■ Keep the work area free of nonconductive materials such as ordinary
plastic assembly aids and foam packing. Use conductive field service
tools.
■ Avoid touching pins, leads, or circuitry.
■ Always place disk drives PCB-assembly side down.










