Compaq ProLiant ML350 Tower-to-Rack Conversion Guide
Rack Installation 2-3
Compaq Confidential – Need to Know Required
Writer: Doug Warren Project: Compaq ProLiant ML350 Tower-to-Rack Conversion Guide Comments:
Part Number: 201346-001 File Name: c-ch2 Installing.doc Last Saved On: 6/27/00 9:36 AM
Optimum Environment
When installing your ProLiant ML350 server into a rack, the following
requirements must be met:
■ Space
■ Power
■ Grounding
■ Temperature
■ Airflow
Space Requirements
Consider the following items when deciding where to install your Compaq
rack:
■ Clearance in front of the rack should be a minimum of 25 inches for
servicing.
■ Clearance in back of the rack should be a minimum of 30 inches to
allow for servicing and for adequate airflow.










