Compaq ProLiant ML350 Tower-to-Rack Conversion Guide
1-16 Compaq ProLiant ML350 Tower-to-Rack Conversion Guide
Compaq Confidential – Need to Know Required
Writer: Doug Warren Project: Compaq ProLiant ML350 Tower-to-Rack Conversion Guide Comments:
Part Number: 201346-001 File Name: b-ch1 Preparing the Server.doc Last Saved On: 7/7/00 10:05 AM
Applying the Hard Drive Labels
Depending on your server model, you should place one or both of the
following labels onto the server chassis before installing the rack-mount front
panel.
Applying the Chassis Labels
(Hot-Plug Hard Drive Models Only)
To apply the chassis labels:
1. Locate the two unmarked beige-colored labels included in your kit.
2. Apply the labels above and below the hard drive opening on the server
chassis as shown in Figure 1-13.
Figure 1-13. Applying the chassis labels (hot-plug hard drive models only)










