Compaq ProLiant ML350 Tower-to-Rack Conversion Guide

Preparing the Server 1-11
Compaq Confidential Need to Know Required
Writer: Doug Warren Project: Compaq ProLiant ML350 Tower-to-Rack Conversion Guide Comments:
Part Number: 201346-001 File Name: b-ch1 Preparing the Server.doc Last Saved On: 7/7/00 10:05 AM
3. Disengage the locking brackets and remove them by pulling out.
1
1
2
Figure 1-8. Removing the locking brackets
NOTE: The interior of the server may look different depending on the model purchased.
4. Reinstall the access panel and tighten the thumbscrews.