ProLiant ML350 Generation 4 Reference and Troubleshooting Guide

Table Of Contents
Hardware Options Installation 75
2. Reverse step 1 to secure the cable management arm after the maintenance
procedures have been completed.
Installing a Second Serial Port
To install the second serial port option:
1. Power down the server ("Powering Down the Server" on page 21).
2. Extend the server from the rack, if applicable ("Extending the Server from
the Rack" on page 22
).
3. Remove the front bezel door, if necessary ("Removing Front Tower Bezel"
on page 23
).
4. Remove the access panel ("Removing Access Panel" on page 23
).
5. Remove the expansion slot cover ("Removing the Expansion Slot Cover" on
page 65
).
6. Install the serial port bracket and close the slot cover. Connect the serial port
cable to the serial port header on the system board.
7. Replace the front bezel ("Removing Front Tower Bezel" on page 23
), if
applicable.
8. Replace the access panel ("Removing Access Panel" on page 23
).