ProLiant ML350 Generation 4 Reference and Troubleshooting Guide

Table Of Contents
Hardware Options Installation 47
9. Connect the heatsink connector to the header on the system board.
Item Description
1 CPU 1 heatsink header
2 CPU 2 heatsink header
10. Open the latches on the corresponding PPM slot.
11. Install the PPM for processor 2 (if installing a second processor).
NOTE: PPM 1 is embedded onto the system board.