Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide

Hardware Options Installation 3-11
Compaq Confidential Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide Comments:
Part Number: 236843-002 File Name: d-ch3 Hardware Options Installation.doc Last Saved On: 9/5/01 12:33 PM
Installation Guidelines for SCSI Hard Drives
Consider the following guidelines when installing SCSI hard drives:
Install drives into the bays in the following order: 0, 1, 2, 3, 4, 5.
Assign SCSI device IDs in the following order: 0, 1, 2, 3, 4, 5.
See Figure 3-9 and Chapter 4, Cabling Guidelines, for additional
information.
0
1
2
3
4
5
Figure 3-9. Hot-plug SCSI hard drive bay configuration