Selecting a Site
Make sure that the installation area that you select has the following features:
A sturdy, level installation site that includes dedicated and properly
grounded (earthed) circuits, air conditioning, and electrostatic discharge
(ESD) protection
7.6 cm (3.0 inches) clearance on all sides of server for proper ventilation in
a tower configuration
IMPORTANT: See the following section, Installing the Rack Server, for clearance
specifications if you are installing the ProLiant ML350 Generation 2 server into a rack
configuration.
A separate electrical circuit for the server
CAUTION: Protect the server from power fluctuations and temporary
interruptions with a regulating uninterruptible power supply (UPS). This device
protects the hardware from damage caused by power surges and voltage spikes
and keeps the system in operation during a power failure.
To purchase a UPS, contact your local Compaq authorized reseller or
visit the Compaq website:
www.compaq.com/showroom/
Refer to Appendix F, “Specifications,” for detailed power and environmental
site requirements.