HP ProLiant DL380 G5 High Availability Storage Server installation instructions (5697-7748, November 2008)

14. On the Select Computer page, type the name of Server 2 in the Computer name field, click Add,
and then click Next.
The Cluster Administrator assesses configuration details of the new cluster. If there are problems
with the cluster configuration, click View Log and Details to troubleshoot the issue.
NOTE:
If the warning message Cannot find a shareable quorum resource appears on the analysis
page, click Back to return to the Select Computer page, click Advanced and select the
Advanced (minimum) configuration, click OK and complete the Add Nodes Wizard.
15. On the Cluster Service Account page, type the cluster service account user name and password
as assigned by your network administrator.
16. After the cluster creation tasks are completed, click Next and then click Finish.
Server 2 is added to the cluster.
Verify that the active/passive cluster is operational
In order to test cluster functionality, move the cluster group from the active node to the passive node.
This prevents clients from accessing cluster resources through that node. In this event, all resources
owned by this node fail over to the other node in the server cluster.
1. In the console tree, expand the Groups node and select Cluster Group.
2. Right-click and select Move Group.
3. Verify that the cluster group is moved to the other node.
Setting up an active/passive cluster28