ProLiant DL580 Setup and Installation Guide

5-8 Compaq ProLiant DL580 Server Setup and Installation Guide
Compaq Confidential Need to Know Required
Writer: Cynthia Dresden Project: Compaq ProLiant DL580 Server Setup and Installation Guide Comments:
Part Number: 159213-003 File Name: f-ch5 Cabling Guidelines.doc Last Saved On: 4/5/01 2:00 PM
WARNING: To reduce the risk of electric shock or damage to the equipment:
If the system has multiple power supplies, disconnect power from the
system by unplugging all power cords from the power supplies
Do not disable the power cord grounding plug. The grounding plug is an
important safety feature.
Plug the power cord into a grounded (earthed) electrical outlet that is
easily accessible at all times.
Securing the Power Cord
Plug in the power cord. Tie-wrap the AC power cord to the plastic loop
provided on the power supply. Leave an eight-inch service loop for the plug to
prevent the plug from being disengaged accidentally. Refer to rack installation
information for additional cable management guidelines.
Figure 5-4. Securing the AC power cord with tie-wrap