Execute these steps in order, especially when multiple racks are connected
together or when a rack is populated in a separate room and relocated to its
final position.
1. Observe symbols on equipment
, server warnings, and rack warnings.
2. Prepare the server
.
3. Prepare the rack
.
4. Install PDUs
.
5. Install the rack rails
.
6. Install a server in the rack
.
7. Connect the cables
.
8. Complete the installation
.
server preparation
Before installing the server in a rack, install any optional hardware components.
Refer to the server documentation for details.
rack preparation
Rack selection criteria and recommendations are beyond the scope of this
document. A bustle or an extension kit may be required if the installation will
end up with several cables for all the servers, for example, KVM cables. For
complete details on rack installation, refer to the documentation shipped with
the rack.
power distribution
solutions
HP recommends using power distribution units (PDUs) in installations where a
number of server units can place serious loading demands on the AC power
bus. HP offers PDUs that provide safety and reliability to multi-server installations.
The units described in this white paper offer 0U/1U mounting options and
feature circuit-breaker protection of equipment in groups.