Compaq ProLiant DL380 Setup and Installation Guide
Installing the ProLiant DL380 Server
2-31
Compaq Confidential – Need to Know Required
Writer:
Gilbert Saldivar
Project:
Compaq ProLiant DL380 Setup and Installation Guide
Comments:
Part Number:
120133-002
File Name:
c-ch02 Server Installation Overview.doc
Last Saved On:
12/10/99 1:04 PM
Use the following procedure to connect the power cord and peripheral cables:
1.
Plug cables into the server.
Figure 2-26. Cabling through the cable management arm and cable support
2.
Plug the power cords into the server. Make a small loop in each power
supply cable and secure the loop as a strain relief to the location below
the power supply. This action prevents accidental removal of power
cords when the server slides in and out of the rack.
Figure 2-27. Securing the power supply power cord cable
3.
Bundle all of the cables, including the power cable, and tie them to the
cable management arm.