Compaq ProLiant DL380 Setup and Installation Guide

2-6
Compaq ProLiant DL380 Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer:
Gilbert Saldivar
Project:
Compaq ProLiant DL380 Setup and Installation Guide
Comments:
Part Number:
120133-002
File Name:
c-ch02 Server Installation Overview.doc
Last Saved On:
12/10/99 1:04 PM
Grounding Requirements
For proper operation and safety, this equipment must be properly grounded in
accordance with NFPA 70-1993, Article 250. All power distribution devices,
branch wiring, and receptacles must be “Listed” grounding type devices.
When using power strips for electrical distribution, ensure that ground
integrity is maintained for each connection made. Plug each component into a
reliably grounded outlet.
Airflow Requirements
Compaq ProLiant DL380 servers draw cool air in through the front door and
exhaust warm air out the rear. Therefore, the front door of the rack must be
adequately ventilated to allow ambient room air to enter the cabinet, and the
rear door must be adequately ventilated to allow the warm air to escape from
the cabinet. Do not block the ventilation apertures.
Blanking Panels
If all of the vertical space in the rack is not filled by components, the gaps that
are left will cause a change in airflow through the rack and across the
components. These gaps need to be covered with blanking panels.
Installation Sequence
A brief summary of the steps to install your Compaq ProLiant DL380 server
follows:
1.
Select an appropriate site for your rack.
See the Rack Planning and Information Guide online document. This
guide can be found on the Rack Information Library CD, or the
information can be downloaded from the Compaq website
http://www.compaq.com
2.
Unpack the server and rack mounting hardware.
3.
Install any PCI expansion boards.
See Chapter 3, “Installing Hardware Options.” Refer to the option kit
documentation for detailed instructions.
4.
Install other options.