Compaq ProLiant DL380 Generation 2 Setup and Installation Guide

PCI Hot Plug Technology 8-7
Compaq Confidential Need to Know Required
Writer: Rob Weaver Project: Compaq ProLiant DL380 Generation 2 Server Setup and Installation Guide Comments:
Part Number: 203844-001 File Name: i-ch8 PCI Hot Plug Technology.doc Last Saved On: 4/2/01 3:23 PM
Table 8-3
PCI Hot Plug LED Status Combinations
continued
LED Power Status OK to Open Slot Status
Green
Amber
Off
On
No Power to this slot is turned off, but this slot
needs ATTENTION. There may be a problem
with the slot, expansion board, or driver.
Follow these steps:
1. Open the slot release lever (the amber
LED turns off).
2. Remove, replace, or install the expansion
board.
3. Connect the cables to the expansion
board.
4. Close the slot release lever.
5. Return power to the slot through the PCI
Hot Plug application or by pressing the
PCI Hot Plug button (the green LED turns
on).
Green
Amber
Off
Off
Yes The power to the slot is off. If you need to add
the expansion board in this slot, follow these
steps:
1. Open the slot release lever.
2. Install the expansion board.
3. Connect the cables to the expansion
board.
4. Close the slot release lever.
5. Return power to the slot through the PCI
Hot Plug application or by pressing the
PCI Hot Plug button (the green LED turns
on).