Ultra-Dense Server Deployment in Racks
Compaq Ultra-Dense Server Deployment in Compaq Racks 79
128H-0400A-WWEN
4.6.3. Cable Management Procedure
Cable management procedure will depend on the rail solution used for an installation.
4.6.3.1. Fixed-Rail Cable Management
For details on the installation procedures in this section, refer to the Compaq ProLiant DL360 Setup and
Installation Guide.
Figure 4-23 shows how the power cord and other peripheral/network cables from the server rear panel
connectors are routed into the cable tray clamp. Figure 4-24 shows how to bundle the cables together for
fixed rail installations. The cable bundles should be routed vertically through the cable D-rings attached
on the rack frame.
Figure 4-23. Cable tray clamps securing step on a fixed rail cable tray
2
2
1
1
Figure 4-24. Cable bundle grouping for fixed rail installation