Compaq ProLiant DL360 Ultra-Dense Server Deployment in Compaq Racks

Compaq ProLiant DL360 Ultra-Dense Server Deployment in Compaq Racks 43
128H-1100B-WWEN
Table 3-18. Configuration F parts list
Configuration-F Parts List
Description Compaq P/N Qty. Notes
Sliding rails and cable management solution
option
174575-B21 42 Optional for in-rack servicing
High Voltage 24A PDU option 295363-003 3 N.A. only [See Note(a)]
Vertical-Mount PDU Bracket Kit with High
Voltage Cables
166097-B21 2 Contains 4 PDU brackets and 11
Y-power cords
Note:
This list does not include the rack, the ProLiant DL360 servers, and the network cables.
Table 3-19. Configuration F installation procedures
Configuration-F Installation Procedure
Procedure Section [page]
ProLiant DL360 Preparation 4.1 [63]
Rack Preparation 4.2 [64]
PDU Installation Mechanical unit
Power cord wiring
4.3.2 [67]
4.3.5.2 [71]
Rack Rails Installation 4.4 [82]
Rack Population 4.5 [83]
Cable Dressing Power cord connections
Console cable connections
Cable management procedure
4.6.1 [84]
4.6.2.1 [85]
4.6.3 [88]
Completing the Installation 4.7 [91]