Compaq ProLiant DL360 Generation 2 Server Setup and Installation Guide
Server Features 1-9
Compaq Confidential – Need to Know Required
Writer: Ed Giblin Project: Compaq ProLiant DL360 Generation 2 Server Setup and Installation Guide Comments:
Part Number: 233832-001 File Name: b-ch1 Server Features.doc Last Saved On: 10/12/01 9:39 AM
The cable management system channels the server cables along the back of the
server and to connection points on the rack.
Figure 1-4. Cables routed at the rear of the server
Telco Rack Option
The Telco option contains a set of variable-depth rack brackets that support
installation of the ProLiant DL360 G2 server into Telco racks of rail thickness
from 3 to 5 inches (7.62 to 12.7cm). These brackets adjust to fit several types
of Telco racks, and the kit contains mounting screws.
Figure 1-5. Server mounted in Telco rack










