Compaq ProLiant DL360 Generation 2 Server Setup and Installation Guide
Troubleshooting 10-3
Compaq Confidential – Need to Know Required
Writer: Ed Giblin Project: Compaq ProLiant DL360 Generation 2 Server Setup and Installation Guide Comments:
Part Number: 233832-001 File Name: k-ch10 Troubleshooting.doc Last Saved On: 8/20/01 12:24 PM
Normal Power-Up Sequence
The following sequence of events occurs during normal operation when a
system meeting the minimum hardware requirements is powered up.
1. The front panel Power On/Standby LED turns from amber (standby) to
green (on).
2. The system board fan and power supply fans start up.
3. The server initializes in the following sequence (POST):
a. System initialization
b. PCI auto configuration
c. Video initialization
d. Memory test
e. Memory initialization
f. Processor initialization
g. Power supply checking
h. System event checking
i. Diskette drive
j. CD-ROM
k. SCSI devices
l. Additional IDE devices
4. The operating system boots.










