HP ProLiant DL360 G6 Server MSG

Removal and replacement procedures 50
6.
Apply all the grease to the top of the processor in the following pattern to ensure even distribution.
7. Install the heatsink.
8. Install the air baffle ("Air baffle" on page 36).
9. Install the BBWC battery pack, if removed ("BBWC battery pack" on page 35).
10. Install the access panel ("Access panel" on page 26).
11. Slide the server into the rack.
12. Power up the server.
System battery
If the server no longer automatically displays the correct date and time, you may need to replace the battery
that provides power to the real-time clock. Under normal use, battery life is 5 to 10 years.