ProLiant Server High-Density Deployment Server Solution

Figure 15 is a conventional KVM switch cabling diagram.
Figure 15 Configuration C (Conventional) KVM Switch Cabling Diagram
Completing the Installation
To complete the installation:
4. Install side panels on the outside of the end racks.
5. Install the front and rear doors.
6. Connect the PDUs to the power source.
7. Power up the servers.
30