HP Proliant DL320e Gen8 Carrier-Grade Server Read Before Install Carrier-Grade Instructions.
4 Installing the ProLiant DL320e Gen8 v2 Server into a
Seismic Rack
For information on installing the ProLiant DL320e Gen8 v2 server using the commercial rack mount
kit, see the Quick Deploy Rail System Installation Instructions:
http://www.hp.com/support/dl320e/RailSystemInstallation
While not specifically designed for use in seismic rack solutions, the commercial kit was successfully
evaluated in the AH343A HP Seismic Rack to the NEBS Zone 4 criteria as part of the ProLiant
DL320e Gen8 v2 Server NEBS certification.
IMPORTANT: Cage nuts for the seismic rack must be installed in the appropriate locations, and
the kit must be installed as described in the HP Quick Deploy Rail System Installation Instructions
for Threaded-Hole Racks.
IMPORTANT: You must provide the screws to secure the slide mounting bracket assemblies.
IMPORTANT: The server must be secured in the rack using the captive screws located behind
the plastic retention levers on each side of the server
NOTE: The square-hole cage nuts that are provided in the rack kit do not fit in the round holes
in the seismic rack.
8 Installing the ProLiant DL320e Gen8 v2 Server into a Seismic Rack








