ProLiant DL320 Setup and Installation Guide

Installing the Server 4-23
Compaq Confidential Need to Know Required
Writer: Gilbert Saldivar Project: Compaq ProLiant DL320 Setup and Installation Guide Comments:
Part Number: 203836-001 File Name: e-ch4 Installing the Server.doc Last Saved On: 8/23/00 4:07 PM
11. Press in and hold the rail release latches .
12. Holding the rail release latches, extend the server until the latches clear
the rack
.
NOTE: 1U of space is left empty in the drawing for clarity purposes. The ProLiant DL320
server should be installed in every U from the bottom of the rack. This arrangement
provides maximum density. Work from the bottom of the rack up, filling all spaces.
13. Pull the server completely out of the rack, and set it on a flat, level
surface.
2
3
1
1
2
Figure 4-18. Disengaging the rail-release latches (cables removed for clarity)