HP ProLiant BL685c G7 Server Blade Maintenance and Service Guide
Removal and replacement procedures 28
5.
Remove the HP Smart Array Controller.
To replace the component, reverse the removal procedure.
Mezzanine card
Optional mezzanine cards enable network connectivity or provide Fibre Channel support. For mezzanine
card locations, see the system board components (on page 58).
Because mezzanine cards are supported on multiple server blade models, the mezzanine card may have
captive screws that are not required to secure it to the server blade. When installing a mezzanine card in this
server blade, only two captive screws are required.
To remove the component:
1. Power down the server blade (on page 22).
2. Remove the server blade (on page 23).
3. Remove the access panel ("Access panel" on page 24).










