HP Surestore NAS 8000 Direct Attach Solution Integration Manual
Installation Guide 27
4. Connect the components to the Power Distribution Unit (PDU):
a Connect the power cables of each component to the PDU strip on the rack as shown in
the
Power Connection Diagram
in Section 4 of this binder.
b Plug the PDU into the Power Distribution Panel (PDP) on the UPS.
c Power up the components one at a time, in the following sequence, to minimize current
inrush:
1. UPS
2. Tape Library
3. Disk Enclosures
4. Storage Arrays
5. NAS Server
Caution Do not boot the NAS server until the storage array has finished powering up. As
the array is powering up, amber and green lights will turn on and blink. When
only green lights remain on, it is safe to boot the NAS server.