HP Surestore NAS 8000 SAN Solution Integration Manual

26 Installation Guide
4. Connect the components to the Power Distribution Unit (PDU):
a Connect the power cables of each component to the PDU strip on the rack as shown in
“Solution Integration and Product Configuration Overview” on page 3.
b Plug the PDU into the Power Distribution Panel (PDP) on the UPS.
c Power up the components one at a time, in the following sequence,
one at a time, in the following sequence,one at a time, in the following sequence,
one at a time, in the following sequence, to minimize current
inrush:
1. UPS
2. Tape library
3. NAS server