HP MSA 2040 User Guide (723983-002, September 2013)
92 Index
installation checklist 19
site requirements
85
troubleshooting
53
web-browser based configuring and
provisioning
49
weight
85
Ethernet cables
requirements
36
F
faults
isolating
expansion port connection fault
60
host-side connection
58
methodology
51
H
host interface ports
FC host interface protocol
loop topology
32
point-to-point protocol
32
iSCSI host interface protocol
1 Gb
32
10GbE
32
mutual CHAP
32
SAS host interface protocol
33
SFP transceivers
31
hosts
defined
31
stopping I/O
53
HP
customer self-repair (CSR)
70
product warranty
70
I
IDs, correcting for enclosure 53
installing enclosures
installation checklist
19
IP addresses
setting using CLI
44
setting using DHCP
44
L
LEDs
disk drives
75
enclosure front panel
Enclosure ID
73, 74
Fault ID
73, 74
Heartbeat
73, 74
Unit Identification (UID)
73, 74
enclosure rear panel
MSA 2040 SAN
10GbE iSCSI Host Link Status/Link Activity
77
1Gb iSCSI Host Link Status/Link Activity 78
Cache Status
77, 78
Expansion Port Status
77, 78
Fault/Service Required
77, 78
FC Host Link Status/Link Activity
77
FRU OK
77, 78
Network Port Link Active
77, 78
Network Port Link Speed
77, 78
OK to Remove
77, 78
Unit Locator
77, 78
MSA 2040 SAS
6/12 Gb Host Link Activity
79
6/12 Gb Host Link Status
79
Cache Status
79
Expansion Port Status
79
Fault/Service Required
79
FRU OK
79
Network Port Link Active
79
Network Port Link Speed
79
OK to Remove
79
Unit Locator
79
power supply unit
Input Source Power Good
80
Voltage/Fan Fault/Service Required
80
supported drive enclosures (expansion)
LFF enclosure rear panel
Fault/Service Required
81
FRU OK
81
OK to Remove
81
power supply
81
SAS In Port Status
81
SAS Out Port Status
81
Unit Locator
81
local management host requirement
84
P
physical requirements 85
power cord requirements
86
power cycle
power off
28, 29
power on
28, 29
power supply
AC power requirements
83
DC power requirements
83
site wiring requirements
83
R
regulatory compliance
notices
shielded cables
36, 85
requirements
cabling
20
clearance
84
Ethernet cables
36
host system
31
physical
85
ventilation
84
RFI/EMI connector hoods
36, 85
S
safety precautions 83
sensors
locating
65