HP Virtualization Manager 6.0 Software with Logical Server Management User Guide
Table Of Contents
- HP Insight Virtualization Manager 6.0 Software with Logical Server Management: User Guide
- Table of Contents
- 1 Introduction
- 2 Getting started with Virtualization Manager
- 3 Working with logical servers
- Using logical servers in Virtualization Manager
- New features in logical servers
- Understanding logical servers as they appear in visualization perspectives
- Logical server operations
- Authorizations, requirements, and configuration
- Logical server requirements
- Configuring and registering VMware vCenter
- Configuring VMware vSphere client settings for browsing datastore
- Configuring HP SIM with Onboard Administrator credentials
- Configuring HP SIM for SAN storage validation
- Configuring Extensible Server & Storage Adapter (ESA)
- Configuring Storage Provisioning Manager (SPM)
- LSMUTIL database utility
- 4 Defining storage for logical servers
- 5 Troubleshooting
- Navigation tips
- User preferences tips
- Performance tips
- Problems with meters collecting data
- Search button displays error page
- Displaying empty, hidden resource pools
- Errors accessing single sign-on iLO or Onboard Administrator
- Recovery after logical server operation failures
- Troubleshooting an inoperable logical server
- Correcting problems powering on a logical server
- Logical server operations cannot be cancelled
- Logical Server Automation service fails to start if TCP layer ports are in use
- Use portable WWNs and MAC addresses for Virtual Connect domain groups
- Do not use valid host name as logical server name
- Oversubscribing the number of networks
- Insufficient NICs error when activating or moving logical servers (Virtual Connect Flex-10 support)
- Use caution when renaming or moving a Virtual Connect domain group
- Deactivate or move logical servers before replacing blade
- Unmanaging a logical server using a storage pool entry may result in an inconsistent state
- Synchronize clocks on the CMS, managed systems, and VMware vCenter
- Ensure VM Hosts use fully qualified host names
- VM Hosts must be in same vCenter for ESX virtual machine logical server moves
- VM displayed without association in Virtualization Manager perspectives after deactivation
- Moving logical servers when the CMS and vCenter are in different network domains
- Changing the IP address of a VM Host after logical server discovery prevents the VM Host from appearing as an activation and move target
- Creating and managing logical servers on Microsoft Windows Hyper-V Server 2008
- 6 Advanced features
- 7 Support and other resources
- Index

Table of Contents
1 Introduction......................................................................................................................9
Features...................................................................................................................................................9
Virtualization Manager tabs..............................................................................................................9
Insight Dynamics menus.................................................................................................................10
Virtualization Manager toolbar.......................................................................................................15
Starting Virtualization Manager...........................................................................................................17
Starting from HP SIM......................................................................................................................17
Switching views and perspectives...................................................................................................18
Concepts and terminology....................................................................................................................19
2 Getting started with Virtualization Manager............................................................23
Using the visualization view................................................................................................................23
Purpose of the visualization view...................................................................................................23
Components of the visualization view............................................................................................23
Compartment details..................................................................................................................25
Compartment color definitions..................................................................................................27
Technology icons........................................................................................................................28
Using the workload view......................................................................................................................30
Purpose of the workload view........................................................................................................30
Understanding workload types.......................................................................................................31
Creating monitored workloads..................................................................................................31
Viewing and modifying workload definitions..........................................................................32
Updating system workloads......................................................................................................33
Components of the workload view.................................................................................................33
3 Working with logical servers......................................................................................37
Using logical servers in Virtualization Manager..................................................................................37
New features in logical servers.............................................................................................................38
Understanding logical servers as they appear in visualization perspectives.......................................40
Logical server operations......................................................................................................................41
Activate............................................................................................................................................42
Deactivate........................................................................................................................................42
Create...............................................................................................................................................42
Copy.................................................................................................................................................44
Delete and Unmanage.....................................................................................................................45
Import..............................................................................................................................................45
Manage storage pools and tags.......................................................................................................45
Manage portability groups..............................................................................................................46
Manage target attributes..................................................................................................................47
Modify.............................................................................................................................................47
Move................................................................................................................................................47
Moving Virtual Connect logical servers.....................................................................................47
Servers with Virtual Connect target hosts............................................................................48
Moving ESX, Hyper-V, and HP Integrity virtual machine logical servers................................49
Virtual machine target hosts.................................................................................................50
Move operation types.................................................................................................................50
Power on and off..............................................................................................................................51
Refresh server resources..................................................................................................................51
View logical server details...............................................................................................................52
Table of Contents 3