HP Insight Recovery Technical White Paper

17
Fi
gure 11
Change Local Site to
Primary
/Recovery
buttons
As illustrated in Fi
gure 11
, the
Change Local
S
ite to Primary
button is only available when
the
local
site is in the
recovery site
role
, whereas the
Change Local
S
ite
to Recovery
button
is grayed
-
out at the
recovery site
. At the
primary site
th
e reverse is true,
that is
the Change Local Site to Recovery
button
is e
nabled, but the
Change Local Site to Primary
button
is grayed
-
out.
Insight Recovery and RTO
/
RPO C
onside
rations
Insight Recovery
1.0 provides support for up to 50
DR
-
protected
logical server
s (managed nodes).
When considering the RTO and RPO characteristics of an Insight Recovery solution,
you must
take a
number of factors into account, such as the number
of
logical server
s being protected, the
state of the
dis
k array and storage management
server
(CommandView EVA)
at the
primary site
, the state of the
inter
-
site communication
links
between the
primary
and
recovery site
s
, etc
.
Regarding recovery time (RT
O
)
consideration
s
, Insight Recovery
perform
s
recovery group startup in
approximately
4 to
5
minutes per
logical server
--
i
ncluding
logical server
activation time
. Therefore,
the maximum amount of time
required to failover 50 Logical Servers could be slig
htly more than four
hours, but this can vary depending on several factors
such as the actual number of DR
-
protected
logical servers
.
Referring
to the
hypothetical
Application Tiers
classification
in Table 1,
in that example
Insight
Recovery
would be a
suitabl
e
disaster recovery
solution
(
over
Metropolitan
area
distances
)
for Tiers 2,
3, and 4
but possibly not for
Tier 1
since the worst case total recovery time
for 50
logical server
s
may exceed two
hours.
Insight Recovery provides the ability to
specify a startup order at failover time, so that higher priority
applications
can be started before
those of
lower pri
ority, which is may be useful in addressing
specific RTO requirements.
Meeting r
ecovery point object
ives (RPO)
is
also
dependent on ma
ny factors
including whether the
failover was a planned
or unplanned failover scenario
, and in the case of an unplanned failover
--
Change Local Site to Recovery
(grayed
-
out since the site’s
current role is Recovery)
Change Local Site to Primary