HP Insight Capacity Advisor 6.0 Software: User Guide

4 Planning with Capacity Advisor
Getting ready
In order to get maximum value from the Capacity Advisor tools, it is important to:
Be familiar with the HP SIM framework
Be familiar with the basic operation of Capacity Advisor
Be familiar with Virtualization Manager
Have a clear question you are trying to answer
Have plenty of utilization data collected for Capacity Advisor
Have appropriate access roles on the servers about which you are developing the plan
Understand the equipment well enough to know what is physically possible (such as the
maximum number of CPU cores) and what is practical (such as when to use 1 GB DIMMs
with lots of slots versus when 4 GB DIMMs are more appropriate.) HP software can account
for various power saving associated with specific DIMM.
In addition, it can be very valuable to collect data on a test system to understand the real utilization
characteristics of the applications you are considering.
Task: Understand current resource usage
For specific descriptions of each field shown on the user interface screens, click the on the
software screen.
Table 4-1 Checklist Obtaining reports on current resource usage
Related procedure(s)Task
“First data collection (or the automated nightly collection)”
(page 56)
“Modifying a collection schedule” (page 58)
Ascertaining the data collection availability for a set of
servers” (page 63)
Collect data for a period of time that fully reflects
your business cycle(s).
“The report wizard” (page 69)
“Creating an historic utilization report” (page 70)
Run utilization reports for selected resources of
interest.
“Creating a cost allocation report” (page 73)Estimate current cost allocation for selected
resources.
Getting ready 35