HP Installation Guide, HP Integrity Superdome/sx2000 and HP 9000 Superdome/sx2000 Servers
IMPORTANT: The 48 V switch on the front panel must be OFF.
4. Turn on the ac breakers on the PDCAs at the back of the each cabinet.
• In a large complex, power on the cabinets in one of the two following orders:
9, 8, 1, 0◦
◦ 8, 9, 0, 1
• On the front and back panels, the HKP and the Present LEDs illuminate (Figure 37).
• On cabinet 0, the HKP and the Present LEDs illuminate, but only the HKP LED illuminates
on cabinet 1 (the right cabinet).
Figure 37 Front Panel with HKP and Present LEDs
Turning On Housekeeping Power 45










