HP Installation Guide, HP Integrity Superdome/sx2000 and HP 9000 Superdome/sx2000 Servers

IMPORTANT: The 48 V switch on the front panel must be OFF.
4. Turn on the ac breakers on the PDCAs at the back of the each cabinet.
In a large complex, power on the cabinets in one of the two following orders:
9, 8, 1, 0
8, 9, 0, 1
On the front and back panels, the HKP and the Present LEDs illuminate (Figure 37).
On cabinet 0, the HKP and the Present LEDs illuminate, but only the HKP LED illuminates
on cabinet 1 (the right cabinet).
Figure 37 Front Panel with HKP and Present LEDs
Turning On Housekeeping Power 45