Site Preparation Guide, Third Edition - HP Integrity cx2600

General Site Preparation Guidelines
Sample Site Inspection Checklist
Chapter 3
39
Sample Site Inspection Checklist
Table 3-4 Customer and Hewlett-Packard Information
Customer Information
Name: Phone No:
Street Address: City
or
Town
State or Province: Country:
Zip or postal code:
Primary customer contact: Phone No.:
Secondary customer contact: Phone No.:
Traffic coordinator: Phone No.:
Hewlett-Packard information
Sales representative: Order No:
Representative making survey: Date:
Scheduled delivery date:
Table 3-5 Site Inspection Checklist
Please check either Yes or No. If No, include comment# or date Comment or Date
Computer room
No. Area or condition Yes No
1. Is there a completed floor plan?
2. Is there adequate space for maintenance needs?
Front 36 in. (91.4 cm) minimum, rear 36 in. (91.4 cm)
minimum are recommended clearances.
3. Is there adequate space for access to overhead cable
trough(s)?
4. Is access to the site or computer room restricted?
5. Is the computer room structurally complete?
Expected date of completion?
6. Is a raised floor installed and in good condition?
7. Are floor tiles in good condition and properly braced?