Compaq ProLiant Cluster HA/F500 Administrator Guide

Secure Path Installation Procedures
ProLiant Cluster HA/F500 for MA8000 Administrator Guide 4-7
COMPAQ CONFIDENTIAL
Writer: Woody Jernigan File Name: e-ch4
Codename: Chargers Part Number: 355220-006 Last Saved On: 7/26/02 2:52 PM
3. Verify that the preceding changes were made by entering the following
command:
show units full
You have completed the software configuration required to support the Secure Path
environment. Proceed to the next section to cable the second path. Then you will be
ready to monitor and manage Secure Path activity using the SANworks Secure Path
Manager.
Installing Hardware
This section provides the procedures for installing and terminating a second I/O path
between a storage subsystem and the clustered servers, where a single I/O path
currently exists.
NOTE: Follow normal procedures to power off the server prior to cabling.
Hardware Configuration Overview
Configuring the hardware components consists of three main tasks to be performed in
sequence, as described in the following sections:
1. Installing the second host bus adapter
2. Cabling the hardware components
3. Verifying the hardware configuration
Establishing a Redundant Path for the Microsoft Cluster
The following sections provide information on establishing a redundant path for hubs
and switches.