FW V06.XX/HAFM SW V08.02.00 HP StorageWorks SAN High Availability Planning Guide (AA-RS2DD-TE, July 2004)

Table Of Contents
Configuration Planning Tasks
191SAN High Availability Planning Guide
Task 13: Complete the Planning Worksheet
The planning worksheet included in this task is a four-page form that depicts port
assignments for a director or switch. The worksheet lists 64 ports and provides
fields to identify devices that connect to the ports.
Transfer information from the configuration diagram (completed while
performing “Task 11: Diagram the Planned Configuration” on page 189) to the
worksheet, and transfer port names and nicknames (assigned while performing
Task 12: Assign Port Names and Nicknames” on page 190). In addition, indicate
all unused ports. Retain the planning worksheet as part of a permanent record.
Table 6: Product Planning Worksheet (Page 1 of 4)
Director or Switch Name:
____________________________
IP Address:
____________________________
Unit Name:
____________________________
Attached Devices
Port Port Name Location Type Model IP Address Zone
00
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15